Home Showcase Layouts Projects Features Liveries Listings Interactive Links Site Updates WebRings

 

Section Page Previous Page Next Page

 

Maeport East

by David Passingham

- Page 13 -


The second recent change at Maeport was due to a very severe storm , when half of the cliff and surrounding farmland at the entrance to the harbour was washed away ! The GWR took advantage of this and purchased the land from the local farmer who had no further use for it. The site was levied and a loco shed, coaling facility and turntable are now being constructed.


The new turntable in place, based on a modified Finecast kit

The turntable is a South Eastern Finecast kit. It has a vac-formed well and bridge supports and the track base is a piece of Paxalin. I had to strengthen them all with quite thick Plasticard to ensure they were sufficiently rigid.


A new back garden has sprung up next to the blacksmith

 

Section Page Previous Page Next Page

 

Home Showcase Layouts Projects Features Liveries Listings Interactive Links Site Updates WebRings